- Diameter: PT 1/4
- Weight: 0.3kg
- Structure: filter regulator
- Operating temperature: 0-60 ℃
- Oil recommendation: Gas turbine No. 1 (ISOVG32)
Product Description Installation and use
1,Please pay attention to the installation of cleaning hoses and gaskets, to avoid flying objects in the air path.
2,Installation should pay attention to the direction of air flow and the direction of the same arrow, pay attention to the support of the dental type is correct.
3, the pressure regulator: adjustment upward, turn clockwise, pressure increased, turn counterclockwise, pressure drop. Adjust the required pressure, the teeth are pressed to lock the state.
4, the drainage: no pressure, water automatically discharged, with air pressure, the drainage column to push up, drainage, drainage is completed, the drainage column release, When the water level exceeds the upper limit, please drain in time, otherwise it will lead to dehumidification poor.
5, the amount of oil adjustment: needle clockwise, the amount of oil down, counterclockwise rotation of the needle, the amount of oil decreased. Air flow regulation, adjust needle valve, air flow, voluminous oil, air flow is low and oil droplets reduced.
maintain
1, clean/replace filter: remove filter, blow from inside to outside, can be reused
2, transparent PC cup: remove PC cup, wipe with a clean cloth, can not be cleaned on the PC material of any material.
sold by -shop